Registered Members Login:
   
Forgotten Your Details? Click Here To Recover +
Welcome To The ShareCafe Community - Talk Shares And Take Stock With Smart Investors - New Here? Click To Register >

96 Pages (Click to Jump) V   1 2 3 4 > »    
 
  
Reply to this topic

MNS, MAGNIS RESOURCES LIMITED
stocks
post Posted: Aug 9 2019, 09:16 AM
  Quote Post


Posts: 26
Thanks: 4


In Reply To: blacksheep's post @ Jul 31 2019, 09:18 PM

I would say the top could be any day now, they should have done it long ago when they first come up with the story they was going to get finance in NY.

 
blacksheep
post Posted: Jul 31 2019, 09:18 PM
  Quote Post


Posts: 6,076
Thanks: 2185


Haven't had time to read the Activities report but Cash Flow looks like it needs a top up in the not too distant future

Cash in kitty @ 30/6/19 = $1.8m
Estimated Outflows 3Q2019 = $1.5m

https://www.shortman.com.au/stock?q=mns
Attached thumbnail(s)
Attached Image


 




--------------------
The herd instinct among forecasters makes sheep look like independent thinkers. Edgar Fiedler

If the freedom of speech is taken away then dumb and silent we may be led, like sheep to the slaughter. George Washington

Said 'Thanks' for this post: gumboots  
 
blacksheep
post Posted: Jul 27 2019, 11:01 PM
  Quote Post


Posts: 6,076
Thanks: 2185


India to Get Tesla Type Gigafactories for EV Battery by 2020, Rs 6000 Crore to be Pumped
3 different Lithium-ion battery manufacturers are expected to set up facilities with a combined capacity of 10 gigawatt in Telangana soon, with an investment of Rs 1,500 crore in the first phase.
News18.comUpdated:July 26, 2019, 4:56 PM IST
extract
QUOTE
Three different Lithium-ion battery (Li-ion) manufacturers are expected to set up their facilities with a combined capacity of 10 gigawatt in Telangana soon, with an investment of Rs 1,500 crore in the first phase.

Director of Electronics, Telangana, Sujai Karampuri, withholding the names of the companies, said the construction of three different facilities is expected to begin in a month or two and production of the cells would begin between nine to 15 months after that. He also indicated that the initial production capacity would be ramped up from one gigawatt in the phase one to 10 gigawatt in the due course with a total investment of Rs 6000 crore.

"Right now they are in the pipeline. We will disclose the names in a matter of month or so. All the three companies put together, it is over Rs 1500 crore investment. The construction would probably start in a month or so. It takes typically nine months to 15 months to come up to the production stage. The combined capacity would approximate 10 gigawatts," he told reporters.

"First they'll start with one gigawatt in the first phase, then they go up to 5 gigawatts. There will be investing Rs 1500 crore in the first phase. But it would translate approximately Rs 6000 crore, total put together for all three phase," he said on the sidelines of 'Electric vehicle Summit-2019.'

The Telangana government had recently informed the NITI Aayog that it was capable of setting up a Giga-Scale Li-ion Battery Manufacturing Plant as envisioned by the Centre. Karampuri said the state government is developing a 200-acre park for EVs, which can further be developed to 800 acres in future.

Telangana Principal Secretary for IT and Industries Jayesh Ranjan said, the state government is implementing various measures and incentives for electric vehicles and related ecosystem under the State's EV Policy, though officially not launched.

On the other hand, state-run BHEL and Libcoin are in talks to form a consortium to initially build a 1GWh lithium-ion battery plant in India, the government has said. The plant's capacity will be scaled up to 30GWh in due course.

"BHEL will be sending a team of senior officers for study of the facilities, R&D infrastructure and other techno-commercial issues soon. Based upon the evaluation and recommendations of the team, further process towards formation of joint venture will be carried forward," the heavy industries and public enterprises ministry said in a statement.

"This project also includes 'Made by India, for India', with focus on core-cost components manufactured domestically. It will also create integrated manufacturing ecosystem resulting in self-reliance and lower cost," the statement issued by the Heavy Industries Ministry said
.

https://www.news18.com/news/auto/india-to-g...ed-2246801.html



--------------------
The herd instinct among forecasters makes sheep look like independent thinkers. Edgar Fiedler

If the freedom of speech is taken away then dumb and silent we may be led, like sheep to the slaughter. George Washington

Said 'Thanks' for this post: Amorga  gumboots  
 
blacksheep
post Posted: Jul 27 2019, 04:06 PM
  Quote Post


Posts: 6,076
Thanks: 2185


Article in Townsville Bulletin - needs subscription to read but suggests Edify Energy may join Pure Minerals and Imperium3 at Lansdown - building a $400 mil 200MW solar farm - part of 10 projects short listed by Qld Government - http://epbcnotices.environment.gov.au/_ent...t=1561593600335

QUOTE
BID TO LAND SOLAR FARM TO POWER JOBS FOR REGION
One of the biggest solar farms in Australia could soon be part of Townsville City Council’s Lansdown Industrial Precinct 40km west of the city.


QUOTE
Renewables 400 Shortlist
Shortlisted for the provision of binding bids for supply of renewable energy are:

ACCIONA Australia – MacIntyre Wind Farm at Stanthorpe (540MW, no storage)
Edify Energy – Majors Creek Solar Farm at Woodstock (200MW solar, storage capacity unknown)
First Solar Australia – Chinchilla Solar Farm (100MW solar, storage capacity unknown)
Goldwind Australia – Clarke Creek Wind Farm (between Rockhampton and Mackay – 800MW, storage capacity unknown)
Infigen Energy – Forsayth Integrated Facility (Wind – 65MW, storage capacity unknown)
Lyon Infrastructure Investment – Cape York Solar Storage at Lakeland (55MW solar, up to 20MW/80MWh battery storage)
Neoen Australia – Kaban Green Power Hub at Ravenshoe (Wind – 130MW, up to 100MW storage)
Pacific Hydro Australia Developments – Haughton Solar Farm near Townsville (100MW, storage capacity unknown)
Vena Energy – Collinsville North Solar (100MW, storage capacity unknown)
Windlab – Lakeland Wind Farm (100MW, no storage)
After the bids are submitted and reviewed, CleanCo will recommend projects to the Government; but that won’t happen until early next year.


http://statements.qld.gov.au/Statement/201...eanco-kicks-off

Map shows location - https://maps.dnrm.qld.gov.au/electricity-ge...on-map/#results



--------------------
The herd instinct among forecasters makes sheep look like independent thinkers. Edgar Fiedler

If the freedom of speech is taken away then dumb and silent we may be led, like sheep to the slaughter. George Washington

Said 'Thanks' for this post: Amorga  gumboots  
 
stocks
post Posted: Jul 13 2019, 07:16 PM
  Quote Post


Posts: 26
Thanks: 4


In Reply To: blacksheep's post @ Jul 13 2019, 11:35 AM

That post was to ONLY prove to Anne that I do post on other sites.

 
blacksheep
post Posted: Jul 13 2019, 11:35 AM
  Quote Post


Posts: 6,076
Thanks: 2185


In Reply To: stocks's post @ Jul 13 2019, 10:51 AM

QUOTE
Not sure why he comes here to ask the same question he asks on Topjocks - which could easily be answered by Anne/cabbie (or which ever other nic he uses these days) over there.

Don't think anyone here is interested in your battles with Anne/cabbie et al on Topjocks - best you keep it "inhouse" over there. Why clog up this sites' MNS thread with that rubbish?

Happy to read here any input you make on MNS



--------------------
The herd instinct among forecasters makes sheep look like independent thinkers. Edgar Fiedler

If the freedom of speech is taken away then dumb and silent we may be led, like sheep to the slaughter. George Washington

Said 'Thanks' for this post: Amorga  gumboots  
 


stocks
post Posted: Jul 13 2019, 10:51 AM
  Quote Post


Posts: 26
Thanks: 4


In Reply To: gumboots's post @ Jul 11 2019, 06:40 AM

Our Anne was SO SURE that I could not post any place.

 
blacksheep
post Posted: Jul 11 2019, 10:22 AM
  Quote Post


Posts: 6,076
Thanks: 2185


In Reply To: gumboots's post @ Jul 11 2019, 06:40 AM

QUOTE
also, it seems "stocks" is Pilots


He had me at hello - or was it "we was" back in April 2018, as per this post

QUOTE
Posted: Apr 26 2018, 08:13 PM
In Reply To: Amorga's post @ Apr 26 2018, 10:23 AM

Anyone else of the opinion stocks is another nic of pilots/uniden? biggrin.gif He had me at "We was..."


Not sure why he comes here to ask the same question he asks on Topjocks - which could easily be answered by Anne/cabbie (or which ever other nic he uses these days) over there.



--------------------
The herd instinct among forecasters makes sheep look like independent thinkers. Edgar Fiedler

If the freedom of speech is taken away then dumb and silent we may be led, like sheep to the slaughter. George Washington

Said 'Thanks' for this post: gumboots  
 
gumboots
post Posted: Jul 11 2019, 06:40 AM
  Quote Post


Posts: 205
Thanks: 292


In Reply To: blacksheep's post @ Jul 7 2019, 08:03 PM

b/sheep....

things are looking up for MNS rolleyes.gif

also, it seems "stocks" is Pilots thumbdown.gif

 
blacksheep
post Posted: Jul 7 2019, 08:03 PM
  Quote Post


Posts: 6,076
Thanks: 2185


2019 ASIA PACIFIC CITIES SUMMIT & MAYORS FORUM - Brisbane Australia, 7 - 10 July

QUOTE
In a first for the Asia Pacific Cities Summit (APCS) and Mayors' Forum, city leaders, Chief Procurement Officers and local government representatives will present upcoming major project commercial tenders, procurement activities and partnership opportunities with cities across the Asia Pacific region. Attending delegates will hear first-hand the latest upcoming tender opportunities in local governments in Australia and internationally.

Presentation and projects
The following projects will be announced at the 2019APCS. For detailed information including the session times and presenters, please view the full program.


QUOTE
7. Townsville Advanced Manufacturing Hub Project:

The Townsville Advanced Manufacturing Hub is a 2200-hectare site that will be home to a number of advanced manufacturing projects including the $2 billion 15 GWh Lithium-Ion Battery Plant being developed by the Imperium3 group. Once in full production, the 15Gwh manufacturing facility can produce either 250,000 car batteries per annum (up to 400kims range) or one million home battery units or support 300 microgrids to power small towns. The project will also have tremendous benefits to Townsville with up to 1000 new jobs in the direct support businesses with up to 5000 new jobs in downstream original equipment manufacturing.


https://www.apcsummit.org/major-project-ann...ement-briefings



--------------------
The herd instinct among forecasters makes sheep look like independent thinkers. Edgar Fiedler

If the freedom of speech is taken away then dumb and silent we may be led, like sheep to the slaughter. George Washington

Said 'Thanks' for this post: gumboots  
 
 


96 Pages (Click to Jump) V   1 2 3 4 > » 

Back To Top Of Page
Reply to this topic


You agree through the use of ShareCafe, that you understand and accept the TERMS OF USE.


TERMS OF USE  -  CONTACT ADMIN  -  ADVERTISING