Got this in an email from John Campbell of Oil and Gas weekly fame.

 

 

 

Media speculation in February and March suggested 2014 would be the year uranium stocks recovered from their post Fukushima fall. Reports of renewed Japanese confidence in nuclear power and the proposed restarting of several shut in power plants fuelled the speculation.

 

As did the expanding Chinese nuclear power reactor construction program that was said to be ahead of schedule.

 

On 26 February Paladin Energy was up 20%; Bannerman Resources up 18%; Berkeley Resources up 23%; Deep Yellow up 50%; Toro Energy up 11%; Energy Resources up 8%; and Peninsula Energy up 17%. All on heavy volume. All in the one trading day!

 

The huge moves came after similar gains in overseas stocks the night before including CanadaÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s Cameco one of the worldÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s largest uranium producers. Their run was sparked by reports the Japanese GovernmentÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s official Energy Policy Paper endorsed nuclear power as central to JapanÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s energy future.

 

The moves demonstrate the gains that are waiting in the sector once confidence in nuclear power returns. Many analysts say that is close.

 

 

 

 

Mick

 

 

 

 

Link to comment
Share on other sites

 

JapanÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s New Energy Plan Could be Positive for UraniumÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s Future

Monday April 14, 2014, 4:30am PDT By Teresa Matich - Exclusive to Uranium Investing News

 

Japan isnÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢t giving up on nuclear yet, and its CabinetÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s recent approval of a new energy plan could be the first step toward a uranium market turnaround. The plan calls the heavy metal ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“an important baseload power source,ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ reinstating its importance in the Japanese energy mix.

 

The plan also confirms that JapanÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“[nuclear] reactors will be restarted once their safety is confirmed,ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ and is the first since Japan halted the operation of its nearly 50 nuclear reactors following the Fukushima disaster in early 2011.

 

Thursday night, the Japanese government approved the energy plan following drafts released earlier this year. A prior draft meant to be released in January was seen by a panel of experts as too dependent on nuclear energy, but Reuters states that Prime Minister Shinzo Abe fought for months to convince fellow Cabinet members to accept a draft that reinstates nuclear power. Still, Japanese Industry Minister Toshimitsu Motegi told the news outlet, ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“[t]he plan makes clear we will reduce reliance on nuclear power through a variety of measures.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ

 

 

 

 

Reactors back online?

 

Japan has struggled so far this year to restart its nuclear reactors, and the official statement on the issue in its energy report signals that the island nation is serious about getting its plants up and running. The countryÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s Nuclear Regulation Authority as well as local governments must still give final approval for individual restarts, but as Raymond James analyst David Sadowski explains in a note to investors, the statement still represents ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“a major hurdle cleared in the effort to restart the nationÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s reactors this year.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ

 

Sadowski also said, ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“we believe that NRA approvals on [the first] units may come as soon next week as part of the Japan Atomic Industrial Forum in Tokyo.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ

 

Cantor Fitzgerald analyst Rob Chang has similar views regarding the energy planÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s approval, commenting in a note to investors, ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“[w]e did see this as a rubber stamp however it did take longer than we thought. We expect 2-6 reactors to be approved and/or restarted this year ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â‚¬Å¡Ã‚¬Ãƒâ€¦Ã‚¡ÃƒÆ’‚¬Ãƒâہ¡ÃƒÆ’‚ two in the next three months.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ

 

Others are more wary. Reuters points out that high upgrade costs, local opposition and seismic risks could mean that many reactors will stay closed despite the recent announcement, while Paris-based independent energy consultant Mycle Schneider told the publication, ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“I think it is unavoidable that the Japanese utilities will write off most of their nuclear ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¹Ãƒƒâ€Â¦ÃƒÆ’¢Ã¢Ã¢â‚¬Å¡Ã‚¬Ãƒâ€¦Ã¢â‚¬Å“assetsÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢ and move on.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ However, JapanÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s resource-poor economy cannot continue to support current levels of spending on the costly fossil fuels that have replaced nuclear since the reactor shutdowns.

 

As Akio Mimura, chairman of the Japan Chamber of Commerce and Industry, stated, ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“t is essential to quickly recover a low-cost and stable power supply system by restarting reactors whose safety is confirmed.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ

 

A catalyst the market has been waiting for

 

Uranium Investing News wrote in February that uranium market watchers have been waiting for a definitive signal that Japan is ready to put its reactors back to work, and ThursdayÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s energy plan approval could be the ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“rubber stampÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ that this is about to happen soon.

 

Sadowski sees ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“restarts as the most important catalyst for increased utility contracting and eventual higher uranium prices.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ He calls the ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“increased visibility on restartsÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ a ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“critical psychological catalyst for the sector,ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ and states that once the first reactors start to return, global utilities will end their 17-month buyersÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢ strike for the metal.

 

However, Sadowski also notes that the uranium spot price was at an eight-year low of US$33.30 per pound last week, and suggests that prices will stay below $40 through 2014. He writes that progress in Japan will be more effective at strengthening uranium equities in the near future, but that uranium prices will wait for the medium and long term before rising.

 

 

 

 

Link to comment
Share on other sites

  • 2 months later...

Japan bleeds as nuclear capacity remains shut down

Japan's ongoing reliance on imported fossil fuels while its nuclear reactors await permission to restart continues to impact on the country's trade deficit and greenhouse gas emissions. The 2014 Annual Report on Energy, published by the Ministry of Economy, Trade and Industry (METI), shows that Japan depended on imported fossil fuels for 88% of its electricity in fiscal year 2013, compared with 62% in fiscal 2010, the last full year before the March 2011 accident at the Fukushima Daiichi plant.

 

The additional fuel costs that Japan faced in fiscal 2013 to compensate for its nuclear reactors being idled was ÃÆâ€â„¢ÃƒÆ’ƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ¥3.6 trillion ($35.2 billion). Japan reported a trade deficit of ÃÆâ€â„¢ÃƒÆ’ƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ¥11.5 trillion ($112 billion) for the year, largely due directly and indirectly to these additional fuel costs. This is much more than the 2012 trade deficit, and follows a ÃÆâ€â„¢ÃƒÆ’ƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ¥6.6 trillion ($65 billion) surplus in 2010. Electricity consumption has decreased since 2010 and tariffs for industrial users have increased 28%.

 

Emissions from electricity generation accounted for 486 Mt CO2 (36.2%) of the country's total in fiscal 2012, compared with 377 Mt (30% of total) in 2010.

WNN 17/6/14. Japan

Link to comment
Share on other sites

Taiwan backs off on completion of new plant

In response to ongoing political discord, the Taiwan government has ordered unit 1 of the new Lungmen nuclear power plant near Taipei to be ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¹Ãƒƒâ€Â¦ÃƒÆ’¢Ã¢Ã¢â‚¬Å¡Ã‚¬Ãƒâ€¦Ã¢â‚¬Å“sealedÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢ once safety checks are complete and before loading fuel, and construction of unit 2 ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â‚¬Å¡Ã‚¬Ãƒâ€¦Ã‚¡ÃƒÆ’‚¬Ãƒâ€Â¦ÃƒÆ’¢Ã¢Ã¢â‚¬Å¡Ã‚¬Ãƒâ€¦Ã¢â‚¬Å“ now 90% complete - to be halted. A referendum on the future of the plant will be held. Lungmen comprises two GE-Hitachi Advanced Boiling Water Reactors of 1350 MWe each. Construction began in 1999 with intention of 2004 completion, but political interference from an early stage has delayed construction and greatly increased costs. In addition, the Atomic Energy Council of Taiwan has been scathing concerning management of the project. Some $9.9 billion has been spent on the plant so far.

 

Taiwan imports 97% of its energy and depends on nuclear power from six reactors for a quarter of its base-load power and 16% of electricity overall. Its oldest reactors are due to start closing from 2017. Nuclear power is by far the lowest cost source of TaiwanÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s electricity, and the Minister for Economic Affairs has warned that power prices will rise substantially without the new nuclear capacity. In marked contrast to mainland China, there has been significant opposition to nuclear power in Taiwan for more than a decade.

WNN 28/4/14. Taiwan

Link to comment
Share on other sites

  • 1 month later...

 

Queensland prepared for uranium mining

01 August 2014

 

The government of the Australian state of Queensland says it is now ready to accept applications for uranium mining projects following its announcement of a new regulatory framework. The state lifted its long-standing ban on uranium mining in 2012.

 

Mine minister Andrew Cripps today released "a modern and robust" framework to ensure that uranium mining in Queensland is carried out according to the world's best environmental protection and safety standards.

 

The government said the framework "provides regulatory efficiency and investment certainty" for uranium mining in Queensland. It "adopts the same obligations that apply to existing mineral tenure holders, including compliance with land access and native title laws."

 

Under the framework, applications for uranium mining projects will be assessed by the Queensland Coordinator-General, while environmental assessments and approvals for projects will be completed jointly by the state and Australian governments. Any uranium mined in Queensland will only be exported to countries that have a bilateral safeguard arrangement with Australia. Uranium will be exported through existing licensed ports in Darwin and South Australia as there are currently no ports in Queensland licensed for the export of uranium.

 

The Queensland government has established the Uranium Mining Oversight Committee (UMOC) to facilitate open discussions between state government departments and to oversee the development of the uranium industry in Queensland. It said a stakeholder committee will also be established "when there is more certainty about the development of a uranium mine."

 

"The framework paves the way for new investment opportunities, taking into account all relevant issues across the uranium mining life cycle such as strict environmental standards, safe handling, transportation and risk management for safety and health," the state government said.

 

Cripps said, "It is now up to industry to decide when to lodge applications for uranium mining and those decisions will be influenced by a number of factors including global commodity prices, market supply and demand and mining costs."

 

 

Lifting the ban

 

Uranium was first mined in Queensland in the 1950s, but no uranium has been mined there since the closure of the Mary Kathleen mine in 1982. In 1989, the election of a state government led by the Australian Labor Party effectively saw uranium mining, but not exploration, prohibited in the state until the election of a Liberal-National Party led government in March 2012. Seven months later, the ban on uranium mining was lifted.

 

"Labor's ban on uranium mining was purely ideological," said Cripps, "but we have taken steps to ensure this valuable resource is unlocked for the benefit of all Queenslanders."

 

Queensland's department of natural resources and mines estimates the uranium resource potential of the state at 165.95 million tonnes of ore with a total uranium oxide content of 107,000 tonnes (90,730 tU).

 

Cripps also announced the release of the former Mary Kathleen uranium mine for competitive tender for rare earths exploration.

 

Researched and written

by World Nuclear News

 

 

Link to comment
Share on other sites

BHP Billiton lateral thinking on ore processing for Olympic Dam

Having baulked at the $28 billion cost of a major development of the mine two years ago, BHP Billiton has applied for government approval to build and operate a demonstration-scale heap leaching plant at its Olympic Dam mine, as the company looks for more economical ways of expanding the South Australian project. Heap leaching has not previously been used for uranium ore in Australia (that at Rum Jungle over 1965-71 was for copper), though it is increasingly favoured for low-grade hard-rock uranium ores overseas. Laboratory and pilot scale trials of the technique using run of mill ore from the existing operations have shown promising results to date. The company expects to start construction of the demonstration plant in the second half of 2015, with a three-year trial period starting in late 2016.

 

Some 36,000 tonnes of ore - about one day's current mine production - will be used in the trial. The ore will be crushed, placed on an impermeable leach pad and treated with sulphuric acid for 300 days. This is expected to recover most of the uranium, and with the help of bacteria, around half of the copper. The uranium would then be removed from the pregnant liquor by solvent extraction, after which the copper would be removed electrolytically. This essentially reverses the present sequence where most of the uranium is recovered by acid leaching the mill tailings after copper sulphide flotation. Following the heap leaching, the depleted ore remaining will be further crushed, ground and put through the flotation plant on site to recover the rest of the copper as sulphide, which would then be smelted as at present for all production.

WNN 31/7/14. Australian U mining

Link to comment
Share on other sites

 

NexGen Energy Drill Results Hint at District-scale Mineralization

Thursday August 7, 2014, 1:15pm PDT

 

By Vivien Diniz+ - Exclusive to Uranium Investing News

 

 

http://uraniuminvestingnews.com/files/2010...h-in-Canada.jpgAthabasca Basin uranium exploration and development company NexGen Energy (TSXV:NXE) has announced the first assay results from drill hole AR-14-15, completed during this summerÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s program at its wholly owned portion of the Rook I property. The AR-14-15 drill hole was angled to the northwest in order to target subvertical to steeply dipping mineralization at the Arrow discovery.
What the results from drill hole AR-14-15 show is an upper high-grade uranium interval of 22.35 meters; it returned 3.42-percent U3O8 and includes 10.72-percent U3O8 over 6.85 meters, 15.74 percent over 4.5 meters and 26.1 percent over 2.6 meters. The highest-grade assay result within the interval shows 55.8-percent U3O8 over 0.45 meters. At a lower level, the high-grade intervals were found at 32 meters and have a grade of 1.52-percent U3O8, including 10.4-percent U3O8 over 3.15 meters. The highest-grade assay within the interval measures 43.7-percent U3O8 over 0.35 meters.

 

As CEO Leigh Curyer said in the companyÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s press release, NexGenÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s primary objective with the summer program was to establish a ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“large area of mineralization.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ That, said Curyer, was achieved quickly through aggressive, large step outs.

 

ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“In only 22 holes, the team has established a mineralized zone of 515 x 180 m. Secondary, was to obtain an assessment on grade. These are the highest grade assay results over significant intervals to date at Arrow, which have exceeded expectation considering the stage of development. Arrow is developing faster than we ever anticipated at the beginning of the program,ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ Curyer explained.

 

As Resource Reports said on August 6, prior to the release of NexGenÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s assay results, the companyÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s previous nine, widely spaced holes, five of which had off-scale radioactivity, provided investors with an ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“early glimpse to see if a guerilla is lurking in the jungle.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ

 

Indeed, shortly following the news, Cantor FitzgeraldÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s Rob Chang issued a note to clients, calling the AR-14-15 drill hole a ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“world-class calibre hole.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ Encouraged by the results from the assay, Chang noted, ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“[t]his news lends further credence that we have district scale uranium mineralization in the south-western portion of the Athabasca Basin.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ

 

And sure enough, the Southwestern Athabasca Basin does hold potential. With Fission Uranium (TSXV:FCU) churning out drill hole after drill hole of impressive results only 6 kilometers to the south of Rook I at Patterson Lake and UEXÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s (TSX:UEX) Shea Creek project also located in the area, NexGenÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s results are encouraging.

 

As Resource Reports notes, ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“NexGen investors can only have faith in a repeat performance of the Fission Uranium discovery just 6 kilometers south of NexGenÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s Arrow discovery.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ Likewise, Chang told Uranium Investing News that ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Â¦ÃƒƒÂ¢Ãƒ¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…âہ“NexGenÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s results today are the first time weÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢ve seen anyone other than Fission and UEX provide a world-class hole. It does show that there may be a district-scale play here.ÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’â€Å¡Ãƒƒâہ¡ÃƒÆ’‚ÂÂ

 

Given the encouraging results, NexGen has increased the drill program from the initial 13,500 meters to 18,500 meters.

 

On the back of the news today, NexGenÃÆâ€â„¢ÃƒÆ’ƒâہ¡ÃƒÆ’‚¢ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¡Ãƒâہ¡ÃƒÆ’‚¬ÃƒÆ’¢Ã¢Ã¢Ã¢Ã¢â€š¬Ã…¡Ãƒâ€šÃ‚¬ÃƒÆ’…¾Ãƒâہ¡ÃƒÆ’‚¢s share price is up 11.76 percent, at $0.38.

 

 

Link to comment
Share on other sites

This is probably not the best U3O8 chart available but it's the best I could find to put the article recently posted on the PDN thread into context. Maybe some people carry these numbers in their head, but I like to look at a picture.

 

http://i1101.photobucket.com/albums/g434/mcart117/U3O8140814_zps4e7daeba.png

Source: http://www.uxc.com/review/UxCPrices.aspx

 

Here's an extract from the article (also on the other thread):

 

It's news that's almost worth writing home about! Uranium investors will be pleased to note that the uranium spot price showed some signs of life this week. U3O8 prices have managed to claw their way up to $30 for the first time since late spring.

Source: http://uraniuminvestingnews.com/19396/uran...sin-cameco.html

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...