Jump to content

RTR - RUMBLE RESOURCES LIMITED


ShareCafe
 Share

Recommended Posts

  • 1 year later...
  • 8 years later...
Awaiting drilling and results with great anticipation ....

and they are in. was 10c a week ago, and today, at 30c. Wide intersections and good grades, and a likely prospective mineralised zone over 45km of strike. !..

Major Zinc-Lead Discovery at Earaheedy Project, Western Australia

The Chinook Prospect has the potential to be at the upper end of the existing exploration target based on the consistent grades (4% to 5% Zn + Pb), the true thickness (up to 34m vertical), the intersection of Zn / Pb over 2km of strike, the width over 1.1km and the mineralisation being open in all directions.

 

 

 

Of importance is the shallow nature of the Zinc-Lead mineralisation, which is amenable to large scale open cut mining scenarios.

Link to comment
Share on other sites

  • 3 weeks later...

10c in March and now above 74c.

with only $4mill in bank, there was a trading halt for a placement ... raised $40M at 50c a share, to accelerate drilling of Earaheedy. That has not slowed things down it would seem.

 

And there are other prospects

Maiden Gold Resources at Western Queen Project

 

JV Partners Advancing Tier 1 Projects –Potential for Multiple Discoveries

... Thunderdome ; Fraser Range – Tier 1 Ni-Cu Potential

... Thunderstorm ; Fraser Range – Tier 1 Gold Potential

... Lamil Project ; Paterson Province – Tier 1 Copper-Gold Potential

 

Rumble Low Cost High Impact Exploration –Potential for Multiple Discoveries

... Munarra Gully ; Drilling and DHEM – Tier 1 Gold-Copper Potential

... Braeside - Ground IP ; High-Grade Breccia Pipes

... Braeside and Warroo ; Airborne VTEM – VMS Province Potential

 

 

Link to comment
Share on other sites

  • 8 months later...

RTR released an announcement this morning reporting a wide, shallow zone of high-grade Zn-Pb sulphide mineralisation within the recently discovered and newly named Kalitan Feeder Zone at the Chinook Zn-Pb-Ag-Cu Prospect. Outstanding widths and grades.

RTR310122.jpg

 

Link to comment
Share on other sites

  • 2 months later...
  • 2 months later...

Some 26,000m of RC drilling at the Tonka Prospect has been completed with 11,000m of assays currently pending. A further 24,000m of drilling is planned for the remainder of 2022.

So lots of assay results to be announced in the coming months!

0001-min.jpg
Link to comment
Share on other sites

  • 2 weeks later...

Quarterly Activities Report out. Four sets of assay results pending from various projects. Drilling ongoing at the Lamil Project JV and Earaheedy Project (RC drilling at Sweetwater and Tonka Prospects).

Cash position was $17.9 million at the end of the last quarter.

News flow between now and the end of the year should get more frequent as assay results are returned and exploration updates are announced

Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...